Last edited by Gajin
Sunday, May 10, 2020 | History

3 edition of Federal power act, March 1, 1971. found in the catalog.

Federal power act, March 1, 1971.

United States

Federal power act, March 1, 1971.

by United States

  • 66 Want to read
  • 15 Currently reading

Published by U.S. Govt. Print. Off. in Washington .
Written in English


Edition Notes

ContributionsUnited States. Federal Power Commission.
The Physical Object
Paginationvii, 200 p. ;
Number of Pages200
ID Numbers
Open LibraryOL16432770M

Guide to Making Federal Acts and Regulations. 2nd ed. Text in English. Issued also under the title: Lois et règlements: L'essentiel Co-published by the Department of Justice Canada. Includes bibliographical references. ISBN Cat. No. J/E-IN. 1. Legislation--Canada. 2. Delegated legislation--Canada. 3. Legal composition. 4.   Federal Power Act + Follow. Federal Energy Regulatory Commission Proposes Limiting Policy on Tariff Waivers McGuireWoods LLP on 5/22/ At the , Federal .

The Swiss Federal Assembly of the Swiss Confederation passed the federal law on February 2, and put it into force on March 1, The passage of the law made Switzerland home to the most strict and expansive banking secrecy laws in the world. Figure Basin Electric Power Supply Expansion Plan Source: Basin Electric AUTHORIZING ACTIONS The proposed Project must comply with all Federal, State, and local regulations requiring permits or approvals. Table lists agencies and their respective permit/authorizing responsibilities with respect to the proposed Project.

Petitioners ask us, pursuant to § (b) of the Federal Power Act, 16 U.S.C. § l(b), to set aside three orders of the respondent, the Federal Power Commission: 1 (a) An order of March 9, granting a license to the intervener, the Consolidated Edison Company of New York, Inc., to construct a pumped storage hydroelectric project on the. The Federal Power Act (“Act”) is a federal legislation that regulates non-federal hydropower projects in order to support comprehensive development of rivers for energy generation. It was enacted in The Act is officially known as the “federal regulation and development of power”.


Share this book
You might also like
Superconductivity

Superconductivity

Jackson rule

Jackson rule

diamond key and how the railway heroes won it

diamond key and how the railway heroes won it

Water-quality data for selected wells on or near the Idaho National Engineering Laboratory, 1949 through 1982

Water-quality data for selected wells on or near the Idaho National Engineering Laboratory, 1949 through 1982

Hebrew-English edition of the Babylonian Talmud

Hebrew-English edition of the Babylonian Talmud

Stoned like a statue

Stoned like a statue

sculpture of Georges Jeanclos =

sculpture of Georges Jeanclos =

Address of General Oliver O. Howard, commanding the Department of the Columbia, at the decoration of the soldiers graves in the Military Cemetery at Vancouver Barracks, W.T., May 31, 1880.

Address of General Oliver O. Howard, commanding the Department of the Columbia, at the decoration of the soldiers graves in the Military Cemetery at Vancouver Barracks, W.T., May 31, 1880.

VBH HOLDING AG

VBH HOLDING AG

The century of women

The century of women

Federal power act, March 1, 1971 by United States Download PDF EPUB FB2

United States. Federal Power Commission: The national power survey [of the] Federal Power Commission. (Washington: Federal Power Commission; for sale by the Supt. of Docs., U.S. Govt. Print. Off, [) (page images at HathiTrust) United States.

Federal Power Commission: The national power survey: a report / Federal Power Commission. THE FEDERAL POWER ACT What is it. Why do I care. 1 By Lynn Hargis Q. WHAT IS IT.

The Federal Law Passed To Protect Consumers From Excessive Wholesale Electricity Rates. Courts said States could not set electricity rates between States, so the Federal Power Act (FPA) was passed in to enable the Federal Energy Regulatory.

These events led to the passage in of both the Federal Power 1971. book (FPA) and the Public Utility Holding Company Act (PUHCA). Under the FPA, the federal government asserted jurisdiction over the regulatory gap that had developed between state PUCs due to their inability to regulate the prices at which power was transacted in interstate commerce.

“That nothing in that Act, as amended, shall be construed to repeal or amend the provisions of the amendment to the Federal Water Power Act approved March 3, (41 Stat. [section a of this title]), or the provisions of any other Act relating to national parks and national monuments.”.

The Federal Govt and Waterpower Since the first designation inCongress has set aside lands Federal power act both water supply and waterpower production. Title I of the Federal Power Act (FPA) outlines hydroelectric licensing for the United States.

At the end of the FPA, Sect discusses how to handle applications and licenses. likely will occur in March or April of IV. RULEMAKING A. Annual Hydro Charges The FERC announced its proposal to amend the regulations pertaining to Federal power act charges for hydroelectric power projects that use Federal dams and other structures.

FERC Docket No. RM ,48 Fed. Reg. 15, (April 7,); 1. In this order, we grant PacifiCorp’s request pursuant to section of the Federal Power Act (FPA),1 as amended by the Energy Policy Act of (EPAct),2 for an order directing transmission service from Nevada Power Company (Nevada Power). This order benefits customers because it allows for transmission service without jeopardizing a.

OVERVIEW OF THE FEDERAL POWER ACT AND THE HYDROPOWER RELICENSING PROCESS CHAPTER 2 _____ The Federal Power Act (FPA) gives FERC legal authority to issue licenses to non-federal hydropower projects.

As noted in Chapter 1, non-federal projects represent about two-thirds of the hydropower projects operating in the U.S. (1, of 2, projects). FEDERAL REGULATION AND DEVELOPMENT OF POWER; 16 U.S.

Code CHAPTER 12 as of the date of enactment of this Act [Aug. 9, ], hydropower resources. Federal Power Act (): Wrested state regulation of hydroelectric power to newly-created independent federal agency, the Federal Power Commission ("FPC"), the precursor to FERC - more specifically, licensing of hydroelectric power and interstate commerce of electric power and natural gas for "reasonable, nondiscriminatory and just rates" to consumers.

Legal Resources Federal Statutes Federal Statutes The Commission’s legal authority comes from the Federal Power Act and major amendments made to it by the US Congress. The Federal Power Commission {s order dated OctoDocket E authorized the construction of facilities to export electric energy between the United States and Mexico under the terms of' a contract dated March 1, between the West Texas Utilities Company and the Comlsion Federal.

commerce, and Part II 1.dealing with licenses and administrative matters. This expanded act is given the short title of Federal Power Act, 49 Stat. Extracts from Parts 11 md appear herein in chronological order under the Act of Aug FEDERAL POWER ACT PART I [Sec. Federal Power Commission-Greation-composition-~erms OJ.

The Federal Power Act is a law appearing in Chapter 12 of Title 16 of the United States Code, entitled "Federal Regulation and Development of Power". Enacted as the Federal Water Power Act on Jand amended many times since, its original purpose was to more effectively coordinate the development of hydroelectric projects in the United States.

PROVISIONS OF THE FEDERAL POWER ACT Title 18 - Conservation of Power and Water ResourcesMay 1, ; Order36 FRJ ; Order36 FRAug.

Book cost means the amount at which property is recorded in these accounts without deduction of related provisions for accrued depreciation, amortization, or for.

chapter i--federal energy regulatory commission, department of energy part –uniform system of accounts prescribed for public utilities and licensees subject to the provisions of the federal power act authority: 16 u.s.c.

ar, ; 31 u.s.c. ; 42 u.s.c.o. Louisiana Power & Light Co. United Gas Pipe Line Co., F. Supp. (W.D. ) case opinion from the US District Court for the Western District of Louisiana having its principal place of business in the State of Louisiana and is a "public utility" within the meaning of the Federal Power Act, 16 U.S.C.

§ a et seq. and is the. Get this from a library. Federal power act: April 1, [United States.; United States. Federal Power Commission.]. Provisions have been incorporated into this system for those entities which, prior to January 1,were applying the Commission's Uniform System of Accounts Prescribed for Public Utilities and Licensees subject to the Provisions of the Federal Power Act (Class C and Class D) [part of this chapter, now revoked].

Scenic Hudson Preservation Conference v. Federal Power Commission, F.2d (2d Cir. ) is a United States Second Circuit Court of Appeals case in which a public group of citizens, the Scenic Hudson Preservation Conference, organized and initiated legal action after the Federal Power Commission approved plans for Consolidated Edison to construct a power plant on Storm King.

B. FPA Section 10(a) Conditions for Protection, Mitigation, and Enhancement of Environmental Quality Under FPA section 10(a)(1), a project must serve the public interest in a river basin, not just the licensee’s interest in power generation.Federal Power Act of •FPWA became Part I of the Federal Power Act ().

•Increased jurisdiction over non-navigable waters •Reflects broad view of commerce –See FPC v. Union Electric Co. () (Taum Sauk), U.S. 90 () (pumped storage project; effect on “full spectrum of .Federal Power Act The Federal Power Act, along with its amendments, specifies provisions for the development of navigable waterways for hydroelectric power.

It establishes the Federal Energy Regulatory Commission (FERC) for the purpose of issuing licenses for non-federal hydroelectric development projects.